● TECHNICAL SALESCHAPEL HILL, NC · UNITED STATESTRANSFORMER TESTING

Transformer
test equipment
from HighTest
Technology.

Arom Energy supplies HighTest Technology instruments to utilities, manufacturers, laboratories, and industrial power users that require traceable test equipment and practical pre- and post-sale technical support.

01 — Test equipment

HighTest instrument catalogue.

Transformer, circuit breaker, contact-resistance, vacuum-bottle, substation, primary-injection, calibration, and accessory families are available through Arom Energy. Select a family to review the available models and specifications.

01 · TURA Series
Turns Ratio Testers

Turns Ratio Testers

Single-phase & three-phase TTRs. 100 V to 250 V output, built-in printer, optional Bluetooth and battery operation.

TURA-01 · TURA-03 · TURA-03B · TURA-X · BLUE
02 · WINRES Series
Winding Resistance

Winding Resistance

20 A automatic winding resistance testers. Demagnetisation, simultaneous HV/LV, integrated thermometer and printer.

WINRES-20 · WINRES-20B · TRIORES-20 · BLUE
03 · CIBRE Series
Circuit Breaker Analyser

Circuit Breaker Analyser

3 & 6-contact timing analysers with travel transducer support, motion analysis, coil-current logging, built-in printer.

CIBRE-30 · CIBRE-60 · CIBRE-L
04 · ARES / HARE
Contact Resistance

Contact Resistance

200 A and higher DC micro-ohm meters for switchgear, busbars, joints and breaker contacts. Bluetooth-enabled variants available.

ARES-200 · ARES-200D · HARE Series
05 · VABO-80
Vacuum Bottle Tester

Vacuum Bottle Tester

VABO-80 series tests vacuum interrupter integrity up to 80 kV. Battery-powered variant for field use, built-in printer included.

VABO-80 · VABO-80B
06 · SUWI & TRAN
Substation Test Sets

Substation Test Sets

SUWI-120 multifunction substation test set and TRAN-203 three-phase transformer analyser. Combined TTR + winding + dynamic resistance.

SUWI-120 · TRAN-203
07 · PICU-1000
Primary Injection

Primary Injection

PICU-1000 1000 VA primary injection tester for protection-system commissioning, CT testing, and end-to-end verification.

PICU-1000
08 · TRCAL · CBSM
Calibrators

Calibrators

TRCAL-10K turns-ratio meter calibrator and CBSM circuit breaker simulator. Lab-grade reference instruments for QA labs.

TRCAL-10K · CBSM
09 · ACCESSORIES

Cables & Accessories

Original test leads, transport cases, current clamps, contact heads, replacement printer rolls, transducer kits and adapters.

SUWI · TRAN · UNIVERSAL
02 — Operating principles

Clear scope, traceable equipment, accountable support.

Each engagement is handled with defined scope, instrument traceability, practical engineering review, and documented next steps. The objective is straightforward: suitable equipment, reliable measurements, and decisions that can be defended.

01 / FACTORY-DIRECT

Authorised channel

Genuine units shipped via the HighTest UK supply chain. No grey market, no parallel imports. Full manufacturer warranty on every serial number.

02 / ISO 9001

Traceable accuracy

Calibration documentation and instrument records are handled as part of the technical file, so procurement, QA, and field teams can retain a clear audit trail.

03 / SUPPORT

Technical access

Pre-sale specification, test-plan review, post-sale troubleshooting, firmware guidance, and training are managed by people familiar with transformer test practice.

04 / LIFECYCLE

Lifecycle support

Recalibration planning, firmware updates, and authorised repair coordination help keep instruments in service and within the required specification.

03 — How we work

A documented path from request to close-out.

Every equipment supply follows the same sequence: define the technical requirement, confirm the commercial scope, ship and hand over, then maintain the record for ongoing support.

01

Define

Confirm the asset, applicable standard, site constraints, required deliverables, and any witness or reporting requirements.

02

Scope

Provide an itemised equipment or service proposal with assumptions, exclusions, calibration status, and lead-time clearly stated.

03

Execute

Ship configured instruments with full calibration documentation, accessories, and handover support according to the agreed commercial scope.

04

Close out

Provide records, review findings, open-item tracking, recalibration planning, and follow-up technical support where required.

05 — Who we serve

Technical support for critical power assets.

Arom Energy works with organisations responsible for transformer, breaker, and substation test decisions where measurement quality, documentation, and schedule discipline matter.

Transmission & distribution

Utility commissioning teams running new substations, refurbishment programmes, and routine maintenance windows on power transformers up to grid scale.

UTILITIES · TSO · DSO

Industrial plants

Refineries, steelworks, data centres, mining sites — anywhere a private MV substation, large motors or critical breakers need annual proof-testing.

OIL & GAS · METALS · DATA

Renewables & storage

Wind, solar, BESS sites, and substation-scale grid connections. Test sets for collector transformers, breakers, and protection commissioning.

WIND · SOLAR · BESS

Labs & OEMs

Calibration laboratories, transformer manufacturers, and switchgear OEMs needing reference-grade calibrators (TRCAL-10K, CBSM) for QA flow.

CAL LAB · MFG QA
06 — Speak to us

Send the asset details and equipment requirements.

We will respond with the appropriate instrument configuration, accessory list, calibration documentation, and delivery window.